SiAECOSYS 273 6000W 72V 110kph V3 Hub Motor with EM200-2SP controller and kits for electric motorcycle
NOTE:
1.Orders do not include customs duties, which are borne by the buyer.(Except for some aliexpress marked orders including tax).
2.For some special countries with strict customs for import, so pls. confirm it firstly to us that you have ability to do customs clearance, otherwise we will not take on heavy responsibilities for this issue, return money and goods are not support. (special countries list contact seller)
For 6000W motor kits, it could be used for electric motorcycle, which could be 72V 110KPH.
e.g. Electric Motorcycle
E-motorcycle weight, approx 150kg+2*80kg
Speed: peak 110km/h
Climbing slope: 15 degree@230kg
Tire: 130/70-17
Battery: 72V60Ah
One set including below kits
1. 1pcs X QSMOTOR 6000W electric wheel hub motor
2. 1pcs X EM200-2SP sine wave motor controller with standard CAN-BUS
3. 1pcs X 1200W charger with CAN-BUS
4. 1pcs X DKD LCD speedometer
5. 1pcs X Z6 throttle with combination switch
Key Features
1). Simplify to make a electric-motorcycle. Gearbox, transmission shaft, clutch are no need. Which save space.
2). It could be installed in the rear to save more space for battery.
3). Support regenerative braking
4). High efficiency: 85~92%
Product Description
1. QSMOTOR 6000W V2 Electric Motorcycle Hub Motor
Drawing
Test Report
2. EM200-2SP 72V sinusoidal wave BLDC motor controller, with CAN BUS
3. 1200W battery charger with CAN BUS
Drawing
4. DKD LCD speedometer, can-bus(optional, LIN as default)
It display D N R, P, S gear, and battery current X5/10.
P.s.: If the working battery doesn't have can-bus communication, then the can-bus speedometer will shows lack of electricity always.
So, we suggest to do the speedometer as Line communication version if client can't get can-bus battery.
5. Z6 throttle with combination switch
With Reverse, Parking button( throttle on/off), 3 slide switch gear, s/boost button, Light and Horn.
It match with VOTOL controller well.
Please noted:
Optional appearance, drawing, performance curve/test report are available.
If you need more technical information, please feel free to contact us.
We will give you reply in 12hours.
Application
Inventory Last Updated: Nov 27, 2024